Aller au contenu
DRC · Basin 01

Cuvette Central Basin

First Energy Africa’s priority basin — a vast interior position at the heart of the DRC programme, advanced through disciplined, data-led evaluation.

Aperçu du bassin

The Cuvette Centrale is one of the largest intracratonic sedimentary basins on the African continent, occupying much of central DRC beneath the Congo River system.

Our work begins with data: reprocessing what exists and acquiring what is missing, before any capital is committed to the ground.

Programme de travaux du bassin

Un programme progressif

Chaque étape comporte des objectifs et des points de décision définis, et ne progresse que lorsque les preuves le justifient.

PHASE 0 Complete

Data assembly

Legacy datasets assembled and the regional geological framework established.

PHASE I In progress

Seismic & G&G

Reprocessing, basin modelling and prospect maturation across the priority area.

PHASE II Planned

Exploration drilling

First wells to test the highest-ranked prospects against the basin model.

PHASE III Future

Appraisal

Appraisal of any discovery and phased development aligned with national priorities.

À titre indicatif — le séquencement et le statut des phases sont représentatifs et ne constituent pas une divulgation d’engagements de travaux, de réserves ou de ressources.
Nous contacter

Communiquez avec nous

Pour les relations investisseurs, les partenariats ou les demandes des médias, notre bureau de Calgary répond en français et en anglais.